Westland District Council has unanimously resolved to investigate the market value of its closed buildings at 36 and 41 Weld Street in Hokitika, alongside options for building new council premises on council-owned land either at the Hokitika Airport or in the Hokitika Central Business District. The resolution was passed at an extraordinary meeting held on 14 October 2026 and confirmed in minutes dated 29 October 2026.
The decision follows new engineering assessments that rated both the Council Headquarters at 36 Weld Street and the Pakiwaitara Building at 41 Weld Street at 25 per cent of New Building Standards (NBS). A previous assessment had not provided an NBS percentage, though previous management had presented it as resulting in 34 per cent NBS, which had been used as the basis for building use until now; remedial work was suggested at that time but never undertaken.
In response to the 25 per cent NBS finding at 36 Weld Street, Chief Executive B. Phillips closed the headquarters until a more detailed engineering assessment could be completed. In deciding whether to close the building, the council also considered Ministry of Business, Innovation & Employment guidelines on the occupancy of earthquake-prone buildings and the recent Davison report findings on the Mt. Maunganui Beachside Holiday Park landslide. The Pakiwaitara Building at 41 Weld Street was similarly closed after receiving a 25 per cent NBS rating, and tenants in the property have since vacated the premises following discussions.
Structural engineers T. Armstrong and S. Raturi of Eliot Sinclair briefed councillors via audio-visual link on the technical findings. Mr Armstrong noted that while 36 Weld Street has sturdy foundations for the period in which it was built, its built-on extensions pose the greatest risk to life. The 41 Weld Street building also has strong foundations, though it has structural issues. A 25 per cent NBS rating represents a D grade and equates to a 10 to 25 times greater risk to life in an earthquake compared to a 100 per cent NBS rating. While the government considers a building earthquake prone at 34 per cent NBS, the industry standard when strengthening an existing structure is to aim for as near 100 per cent NBS as feasible, with a minimum of 67 per cent NBS.
Addressing ground conditions across Hokitika, the engineers noted that the town sits on sand where a rising water table during high tide creates liquefaction risk, though both 36 and 41 Weld Street are situated on denser sand that is less prone to liquefaction. By contrast, the ground near Hokitika Airport sits well above the high tide mark with an iron pan underneath, carries no liquefaction risk, and would be considered a better place to build.
During deliberations on four initial options—seismic strengthening of 36 Weld Street, strengthening 41 Weld Street to 67 per cent NBS, disposing of one or both buildings, or demolishing and redeveloping one site while disposing of the other—elected members weighed construction suitability against town-centre accessibility. Her Worship the Mayor said she would prefer the council be located in town so community members could visit while running other errands such as shopping, and Councillor Munns said council offices and services should be centrally located in town for community access, whereas Deputy Mayor Burden noted the airport is only 2 kilometres from the CBD and Councillor Mackenzie suggested an electric bus option could be investigated if access were an issue.
Chief Executive B. Phillips advised the council that services will remain fragmented in the short term because no single site in Hokitika is large enough to house all staff together, though the Chief Executive is aiming to have a mid-term solution ready by February 2027. Under the unanimous motion moved by Councillor Mackenzie and seconded by Councillor Manera, staff will report back on the associated costs and timelines for the valuation and building options, and the Chief Executive will report back on the special consultative process required for the options. The Chief Executive told the meeting that any option would need a special consultative process because Council assets are significant, and would go through this year's Long Term Plan process.