Wellington Water has disclosed widespread resource consent breaches at the Moa Point Wastewater Treatment Plant for the July to September 2026 quarter, reporting multiple failures against coastal discharge standards as the facility continues recovery from a major flooding incident on 4 February 2026.
In a regulatory compliance report submitted to Greater Wellington Regional Council under coastal marine discharge permit WGN080003 [31505], the water utility confirmed that the plant remained in a recovery and reinstatement phase, with screened wastewater continuing to be discharged via the long outfall while biological treatment processes await restoration.
Under Condition 10, the plant failed to meet both the 90-day rolling geometric mean and 90-day rolling 90th percentile standards across all three primary water quality parameters: 5-day carbonaceous biochemical oxygen demand (cBOD₅), total suspended solids (TSS), and faecal coliforms. The report also identified severe contamination spikes on 3, 4, and 8 July, which the utility attributed to an automated sampling intake inadvertently drawing settled sludge from an isolated channel during step-screen maintenance, prompting operator Veolia to alter standard operating procedures.
Wellington Water further admitted a breach of Condition 11 after entirely failing to collect mandatory quarterly treated effluent samples required to test for heavy metals and toxic compounds, including arsenic, cadmium, chromium, copper, lead, mercury, nickel, zinc, phenol, and cyanide. The utility attributed the omission to a miscommunication between plant operators and the analytical laboratory, with replacement testing delayed until 22 October 2026.