# Watercare reports blockages were associated with 75 per cent of Auckland’s 5,558 wastewater overflows as overall incidents dip 2 per cent

> Wastewater performance figures for the year to 30 June 2026 also show older combined wastewater and stormwater systems—making up around 2 per cent of the network—accounted for 37 per cent of controlled overflows.

- **Publication:** The Civic Record (Wellington, New Zealand)
- **Desk:** Local Government & Three Waters
- **Kicker:** AUCKLAND INFRASTRUCTURE
- **Byline:** Local Government & Infrastructure Desk
- **Published UTC:** 2026-11-24T09:01:15.140Z
- **Canonical URL:** https://civicrecord.nz/article/watercare-reports-blockages-linked-to-75-per-cent-of-auckland-wastewater-overflows/

---

## Key Figures

- **Total overflows (year to 30 June 2026):** 5,558 — Down 2 per cent from the previous year
- **Overflows associated with blockages:** 75% — Wet wipes, fats, oils and grease can accumulate in pipes and contribute to blockages
- **Controlled overflows from combined pipes:** 37% — From older combined systems making up around 2 per cent of the network
- **Planned 10-year capital investment:** $15.2b — Across more than 1,000 projects and nine major programmes

Watercare recorded 5,558 wastewater overflows across Auckland in the year to 30 June 2026, a two per cent reduction on the previous year, with blockages associated with 75 per cent of those incidents.

Citing its latest wastewater performance report in a media release dated 24 November 2026, Watercare said items such as wet wipes do not break down like toilet paper and, along with fats, oils and grease, can accumulate in pipes and contribute to blockages and overflows. It asked Aucklanders to put wet wipes, dental floss, tampons and other rubbish in the bin.

Heavy rain remained another significant cause of overflows where stormwater and groundwater enter wastewater pipes and increase the volume the network must carry, particularly where pipes are damaged, incorrectly connected or have limited capacity. Older combined wastewater and stormwater systems make up around two per cent of Auckland’s wastewater network, yet accounted for 37 per cent of controlled overflows during the year.

Chief operations officer Mark Bourne said smart sensors installed across the wastewater network in the past year are now preventing more than one overflow a day on average by detecting blockages before they cause wastewater to escape from the system, while sensor pattern data helps inform decisions on maintenance, investigations and investment.

Under its 10-year plan, Watercare plans to invest $15.2 billion in more than 1,000 projects across nine major programmes—including the Herne Bay Collector, Northern Interceptor and targeted upgrades in growth and renewal catchments across Auckland—while expanding investigations to find where stormwater and groundwater are entering the wastewater system.

Alongside public network upgrades, Watercare asked Aucklanders to flush only pee, poo and toilet paper, allow fats, oils and grease to cool before putting them in the bin rather than pouring them down the sink, make sure private stormwater and wastewater plumbing is correctly connected, and report suspected wastewater overflows or network problems promptly. Current information on swimming conditions and water-quality risks is available through Safeswim.

> "The sensors are a practical example of how we're using innovation to reduce overflows. Being able to see patterns in the network from the sensor data also helps us make more effective decisions about maintenance, investigations and investment."
> — **Mark Bourne**, Chief operations officer, Watercare

## Primary Sources

- **Watercare Services Limited (Auckland Water & Wastewater)** (1 Jul 2024): Seventy-five per cent of Auckland’s wastewater overflows linked to blockages — [Original Document](https://www.watercare.co.nz/home/about-us/latest-news-and-media/seventy-five-per-cent-of-auckland-s-wastewater-overflows-linked-to-blockages)
