Waitomo District Council Chief Executive Ben Smit has tabled a decision report for the 24 November 2026 Council meeting seeking formal adoption of two shortlisted options for further investigation to improve the future use and efficiency of the Les Munro Centre and the Waitomo District Library.
Under the suggested resolutions—which do not represent Council policy until adopted by formal resolution—the Council would authorise the Mayor and Chief Executive to carry out a work plan to bring back detailed proposals for two alternatives. The first option keeps two separate buildings, combining a renovation, modest fitout, and floor-area addition to the existing library on its current site with the creation of flexible spaces within the current Les Munro Centre to support a community hub concept. The second option proposes revitalising the Les Munro Centre into a single community hub inclusive of the library, by building a new library facility adjacent to the centre while creating flexible spaces inside the existing venue.
The two shortlisted paths narrow an eleven-option schedule evaluated by elected members at a 17 November 2026 workshop. Alongside retaining the status quo, the workshop options included moving the library into part of its current upper floor, building a new library on a new site in Te Kuiti with potential purpose-built community hub features, delivering new library programmes from the current Les Munro Centre, or demolishing, downsizing, or contracting out or selling the Les Munro Centre.
Following the 17 November workshop, the Council directed that increasing the usage of the Les Munro Centre—through promotional activities, facility management, and modernising infrastructure—must remain a key consideration in both of the shortlisted proposals brought back for further consideration.