# Southland District Council proposes 44.4 per cent Fiordland Community Board rate increase for 2027/2028 on higher parks maintenance contracts

> Draft Long Term Plan 2027–2037 budgets scheduled for the board's 30 November meeting lift urban unit charges by $122.60 to $394.91 and seek feedback on phasing in depreciation funding for footpaths, open spaces, and airports at 10 per cent per annum.

- **Publication:** The Civic Record (Wellington, New Zealand)
- **Desk:** Local Government & Three Waters
- **Kicker:** LOCAL GOVERNMENT
- **Byline:** Civic Record Local Government Desk
- **Published UTC:** 2026-11-25T10:12:49.579Z
- **Canonical URL:** https://civicrecord.nz/article/southland-proposes-fiordland-community-board-rate-increase/

---

## Key Figures

- **Proposed 2027/2028 CB rate revenue:** $1,102,637 — Up 44.4 per cent ($338,775) from $763,861 in 2026/2027 (GST inclusive)
- **Proposed urban full-charge unit rate:** $394.91 — Up 45.0 per cent ($122.60) from $272.31 across 2,600 rated units (GST inclusive)
- **10-year footpath renewal budget:** $2,684,255 — Programmed across years 4 to 10 of the 2027–2037 Long Term Plan
- **Proposed depreciation phase-in:** 10% p.a. — Targeting 100 per cent funding by 2036/2037 against $567,375 in annual depreciation

Southland District Council staff have tabled draft Long Term Plan 2027–2037 budgets for the Fiordland Community Board's 30 November 2026 meeting in Te Anau, proposing a 44.4 per cent increase in total community board rate revenue for the 2027/2028 financial year. Under the draft budgets, total GST-inclusive revenue required to fund the community board rate would rise by $338,775, from $763,861 in 2026/2027 to $1,102,637 in 2027/2028 (or from $664,227 to $958,814 excluding GST). For the area's 2,600 full-charge urban rating units, the proposed charge increases by $122.60 (45.0 per cent) from $272.31 to $394.91 including GST. The semi-urban half charge across 127 units would increase by $61.30 from $136.15 to $197.45, while the rural quarter charge across 515 units would rise by $30.65 from $68.08 to $98.73.

The primary driver of the proposed 2027/2028 increase is higher operating expenditure across parks and reserves following maintenance contract renewals. Excluding GST, gardening contract costs rise by $171,402 and mowing costs increase by $133,035, alongside an additional $18,008 in loan interest and principal costs from 2026/2027 drawdowns and $17,540 in general maintenance including softfall and playground upkeep. Those increases are partially offset by a $31,569 reduction in planned maintenance under a new playground inspection contract, an $11,000 reduction from removing prior-year rate funding for capital projects, and $10,192 in tree and hedge maintenance funded from reserves. At the 30 November meeting, staff will present options to either maintain the draft budget level, fund a portion of costs from reserves, reduce rates while drawing on reserves or short-term loans if actual expenditure exceeds budget, or smooth annual tree and hedge costs through reserve transfers.

Among separate local targeted rates, the Manapouri Hall rate across 345 units is proposed to rise by 22.7 per cent ($11,764), from $51,928 to $63,692 including GST, lifting the charge per unit by $34.10 from $150.51 to $184.61. The Airport Rate across 3,257 units increases by 0.3 per cent ($594) to $194,441, or by $0.38 per unit to $59.69, while total Fiordland Pool Rate revenue across 2,713 units remains unchanged at $37,365 ($13.77 per unit, down three cents). In preparing ten-year budgets, the council's Finance and Assurance Committee has endorsed financial assumptions setting interest on borrowings at 5 per cent and interest on local reserves at 2 per cent, while noting that central government's proposed 2 to 4 per cent annual cap on total council rates revenue (excluding water supply, wastewater, and stormwater rates) would take effect from 1 July 2029 (2029/2030) if enacted.

Separate from the current draft rate calculations, the council is seeking board feedback on a proposal to progressively phase in depreciation funding for footpaths, open space assets, and potentially airport assets at 10 per cent per annum over ten years, reaching 100 per cent funding by 2036/2037. Annual depreciation across the board area is estimated at $567,375 excluding GST, comprising $378,195 for footpaths, $131,277 for open spaces, and $57,903 for the airport. If incorporated, the first-year 10 per cent tranche in 2027/2028 would require an additional $50,947 (excluding GST) from the community board rate—approximately $21 including GST per full-charge unit—and $5,790 (excluding GST) from the local share of the airport rate, or approximately $14 including GST per unit. Meanwhile, following a 2026 network condition survey, no footpath renewals are programmed for the first three years of the ten-year plan, with $2,684,255 budgeted for footpath renewals across years four to ten fully funded by the community board rate on the assumption that NZ Transport Agency Waka Kotahi funding assistance will cover maintenance only.

The agenda also records recent unbudgeted expenditure and district-wide governance decisions affecting the ward. Following recommendations from the board's October meeting, the council approved up to $40,000 in unbudgeted expenditure from the Te Anau General Reserve to install a permanent floating swimming pontoon at Steamers Beach in 2026/2027, alongside a $65,000 unbudgeted grant from board general reserves to the Fiordland Trails Trust to complete Leg 5 of the Lake2Lake Trail between Te Anau and Manapouri. The board also approved a $16,320 unbudgeted grant from the Te Anau General Reserve for a trail link between the Lake2Lake network and State Highway 94, recommended allocating $50,000 per annum for three years in the upcoming Long Term Plan for further trail extensions, and recommended agreeing to a Department of Conservation request to revoke council control and management over part of Section 1008 Block I Manapouri historically occupied by the Te Anau Bird Park.

At a district level, the council has endorsed the draft Roading Bylaw 2027 for public consultation from 16 November to 21 December 2026—proposing a resolution-centric bylaw control model, an Ayr Street Boat Trailer Permit System, and a district-wide unformed legal road framework revoking the Ashton Flats Roading Bylaw 2016—and decided to lodge an application with the Minister under the Local Government (System Improvements) Amendment Act 2026 to retain voting and quorum rights for non-elected members on six subcommittees and committees, including the Te Anau Basin Water Supply Subcommittee and the Stewart Island/Rakiura Visitor Levy Allocation Subcommittee, before those rights otherwise cease on 19 March 2027. Final inflation rates from BERL for years two to ten of the Long Term Plan, final project deliverability timings, and whether to include the depreciation phase-in remain to be determined before the draft plan is released for public consultation in March 2027 and adopted in June 2027.

## Primary Sources

- **Southland District Council** (25 Nov 2026): View (PDF 12.8MB) — [Original Document](https://southland.infocouncil.biz/Open/2026/11/FIO_20261130_AGN_2712_AT.PDF)
