AOTEAROA NEW ZEALAND · JOURNAL OF PUBLIC RECORD

The Civic Record

National Affairs, Parliament, the Courts, Energy, Markets & Local Government

RULINGS PANEL · CODE ENFORCEMENT

Rulings Panel orders Genesis Energy to pay $301,875 fine in its highest pecuniary penalty for Huntly unit 5 dispatch breach

The independent Rulings Panel has imposed its highest pecuniary penalty order against Genesis Energy, plus $9,937.50 in costs, after the generator admitted failing to comply with System Operator dispatch instructions for Huntly unit 5 during two trading periods on 26 January 2024.

$301,875
Pecuniary penalty
Highest pecuniary penalty order made by the independent Rulings Panel
$9,937.50
Authority costs awarded
Costs Genesis Energy was ordered to pay to the Electricity Authority
$2 million
Statutory maximum
Maximum Code breach penalty since 1 September 2022 under the Electricity Industry Act 2010

The independent Rulings Panel has ordered Genesis Energy to pay a fine of $301,875 and $9,937.50 toward the Electricity Authority Te Mana Hiko's costs after finding the company breached the Electricity Industry Participation Code 2010 by failing to comply with dispatch instructions. The fine is the highest pecuniary penalty order made by the Panel.

The Electricity Authority lodged a formal complaint over the alleged breach with the Rulings Panel in December 2025. The Panel found that Genesis failed to comply with System Operator dispatch instructions for Huntly unit 5 during two separate trading periods on 26 January 2024, and Genesis admitted breaching clause 13.82(2) of the Code.

In its 16 November 2026 release on the decision, the Authority noted that compliance with dispatch instructions is critical for maintaining the stability, reliability and efficiency of the power system, ensuring sufficient electricity supply to meet demand at all times, and ensuring fair and transparent operations and avoiding the risk of price distortion. It said that where a generator is not aligned with dispatch instruction, the system's ability to respond to other system events is impacted. An amendment to the Electricity Industry Act 2010 that took effect on 1 September 2022 raised the maximum penalty for Code breaches to $2 million.