Marlborough Emergency Management has reported to the CDEM Group Committee on its draft Mass Relief planning suite, which is designed around a maximum credible scenario of a magnitude 7.5 or greater rupture of the Wairau Fault. The plans remain at drafting stage and have not been approved, exercised or validated.
The operational framework establishes critical planning assumptions for a major seismic event: complete regional isolation from road and rail support lasting weeks to months, total failure of reticulated municipal water and wastewater schemes across the district, and the mass displacement of between 20,000 and 30,000 people—a substantial proportion of the district's approximately 52,000 residents. The framework also incorporates secondary catastrophic scenarios: a Hikurangi Subduction Zone earthquake and local-source tsunami displacing around 5,000 people, primarily from coastal areas, and a failure of Taylor Dam displacing around 8,000 people from low-lying Blenheim.
Because conventional Civil Defence Centres cannot accommodate displacement on this scale, the draft plan provides for simultaneously coordinating shelter-in-place assistance for viable homes, emergency evacuation transport out of the province, billeting and marae-based accommodation, and neighbourhood shelter villages.
However, civil defence reporting revealed a vulnerability in regional fuel supply planning. Marlborough Emergency Management disclosed that following an introductory briefing and two formal survey rounds, the regional wine sector declined to participate, with concerns having been expressed to third parties that survey data could be used to direct or restrict the sector's fuel supply in a fuel shortage. As a result, MEM says it cannot accurately forecast the sector's fuel demand or advocate effectively to the Fuel SCE on its behalf.